Commercial · Erosion Control

Keep the Site Moving. Keep the Soil Where It Belongs.

Erosion control contractor for DFW construction sites: installation, maintenance and repair of project-specified controls, coordinated around your schedule.

  • Install
  • Maintain
  • Repair
  • Closeout support
Silt FenceInlet ProtectionConstruction EntrancesSediment LogsRock Check DamsStabilizationMaintenance & RepairSite Compliance SupportCloseout Support
Construction site erosion control

Practical controls, coordinated around the way your site moves

Erosion and sediment controls play an important role in keeping active sites organized and protecting surrounding areas during construction. Highridge provides practical erosion-control services that can be coordinated around project phasing and site conditions.

Our team works with contractors and development partners to install, maintain and address erosion-control measures as the site evolves. The focus is dependable field execution and clear communication so the scope does not become another unresolved item on the superintendent’s list.

Superintendent’s list

Erosion-control items, handled.

  • Perimeter silt fence installed
  • Inlet protection repaired after rain
  • Construction entrance refreshed
  • Erosion control: off the list
What we handle

Silt fence and erosion-control services, handled in the field

Installation of Project-Specified Erosion Controls

Silt fence, inlet protection, construction entrances and other controls installed to plan and ready for inspection.

Maintenance & Repair

Controls kept functional after rain events and site traffic, with repairs handled promptly.

Site-Specific Field Support

Crews that respond to real site conditions, not just the drawings.

Schedule Coordination

Work sequenced with development and construction schedules as phasing changes.

Closeout & Transition Support

Removal, transition or turnover support where the project requires it.

As the site evolves

Stormwater and erosion controls that keep up with the site

Controls aren't a one-time install. We coordinate the work with your development and construction schedule from first disturbance to final stabilization.

  1. Phase 01

    Mobilization & clearing

    Perimeter controls and construction entrances installed to plan before disturbance begins.

  2. Phase 02

    Grading & earthwork

    Controls maintained and repaired as soil moves, traffic builds and rain events hit.

  3. Phase 03

    Utilities & vertical

    Controls adjusted and relocated as phasing changes the site layout.

  4. Phase 04

    Stabilization & closeout

    Transition, removal or turnover support as the site stabilizes.

One relationship

Need more than erosion control?

Where broader construction or concrete needs exist, Highridge can coordinate related scopes through one relationship.